1+1 Barracks Expansion Program
Client: U.S. Army Corps of Engineers, New York DistrictLocation: Fort Drum, New YorkProject Date: 2004-2008Cost: $204,677,000
Structural Engineering
Task Order Term Contract
Barracks Facilities
The design and technical criteria developed for each Barracks project listed below established the minimum standards for design and construction quality that would be acceptable to the client for use in soliciting design/build proposals. Dormitory-style facilities include private sleeping/living quarters, shared service area and bathroom, soldier community space, laundry, and mail distribution area. Supporting facilities include utilities, electric services, heating, ventilation, air conditioning, fire protection with alarm reporting system, energy monitoring and control system, paving, walks, curbs and gutters, access roads, heat distribution lines, storm drainage, information systems and site improvements. Project site and building design and construction complies with or exceeds DoD Minimum Antiterrorism Standards. The RFP preparation process included QA/QC management with Independent Technical Reviews for each submission. Cost estimates were prepared using MCACES and MII cost estimating software. Design review included posting of comments and evaluations using DrChecks on-line project management system. Each project was designed with the intent of maximizing sustainable design and development practices following the Corps of Engineers Sustainable Project Rating Tool criteria.
- DIVARTY Barracks (100 beds); $8,000,000
- 1st Brigade Barracks Complex (296 beds); $24,000,000
- Pine Plains Barracks Complex (300 beds); $28,000,000
- DIVTROOPS Barracks Complex (634 beds); $47,777,000
- Barracks Complex-10100 Block (450 beds); $44,000,000
- 91st MP Battalion Barracks (654 beds); $52,900,000